logo

Valdelentisco Desalination Plant

Sector: Commercial • Location: Murcia, Spain

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Valdelentisco Desalination Plant Murcia, Spain valdelentisco website 57 hm³/year 70000 m³/day The new desalination plant, located in the Rambla de Valdelentisco, in Mazarrón, Spain, has a production capacity of 57 hm³/year (70,000 m³/day) making it the number one desalination plant in Europe and third in the world. This desalination plant utilizes reverse osmosi

Project Information FAQ

Project Information

4 Q
The project “Valdelentisco Desalination Plant” is an infrastructure initiative in the Commercial sector, located in Murcia, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Valdelentisco Desalination Plant Murcia, Spain valdelentisco website 57 hm³/year 70000 m³/day The new desalination plant, located in the Rambla de Valdelentisco, in Mazarrón, Spain, has a production capacity of 57 hm³/year (70,000 m³/day) making it the number one desalination plant in Europe and third in the world. This desalination plant utilizes reverse osmosis technology. The construction work for the project included a sea water intake using a 4.7 m high cylindrical tower, anchored at a depth of -25.4 m, and water intake pipes in two tranches. The first 627 m executed with jacking pipe, and the second using a 823 m long HDPE pipe, anchored in the seabed. The piping brings water to a pumping station equipped with 81 pumps that drive the water through a double GRP water pipe of 1,800 mm in diameter and 785 m in length to a 1,200 m³ water tank in the enclosure of the plant. From here it is piped for pre-treatment, including filtration and addition of reagents to eliminate any biological activity. Conditioning and water pressure then takes the water to a semi-permeable membrane that allows the water to pass but not any dissolved salts. The process is carried out in 14 separate lines, each with a capacity of 10,000 m³/day. Plans exist to expand the facilities to include another 2 more lines in the future. The brine solution is sent to a hopper, where energy is first recovered in a Francis-type turbine (9,000 m³/ h, power output 490 kW), and then the water is returned to the sea. The resulting clean drinking water is piped to a storage tank, whereby it proceeds to be distributed for consumption. The plant contains Processing Control, Reagent and Operation buildings, as well as those housing electricity infrastructure and transformers.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data