logo

Valdez City - New Well 5 Pumping Station

Sector: Waste Processing and Treatment • Location: Valdez, Alaska, United States of America

Source: Dodge

Project
Closed

Construction of a new groundwater well pumping station including well cleaning and equipping, site and building interior piping, domestic water fill station/water dispenser, tie-in to existing transmission main(s), site grading, asphalt surface driveway and parking area, new wood-frame building with metal, shed-style roof and concrete slab floor, HVAC, lighting, power, new power service, stand-by

Status
Closed
Sector
Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Power Generation (CCGT), Commercial, Cement, Metal, Government
Location
Valdez, Alaska, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Valdez City - New Well 5 Pumping Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Valdez City - New Well 5 Pumping Station” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Valdez, Alaska, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a new groundwater well pumping station including well cleaning and equipping, site and building interior piping, domestic water fill station/water dispenser, tie-in to existing transmission main(s), site grading, asphalt surface driveway and parking area, new wood-frame building with metal, shed-style roof and concrete slab floor, HVAC, lighting, power, new power service, stand-by power generation and telemetry controls.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alaska

City

Valdez

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Power Generation (CCGT), Commercial, Cement, Metal, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project