logo

Vale do Sao Simao Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Companhia Energetica do Vale do Sao Simao, a wholly-owned subsidiary of Grupo Andrade, was granted an authorization to build a 55-MW thermal power plant located in the state of Minas Gerais (municipality of Santa Vitoria) in February 2009. The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same company a

Project Information FAQ

Project Information

5 Q
The project “Vale do Sao Simao Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Companhia Energetica do Vale do Sao Simao, a wholly-owned subsidiary of Grupo Andrade, was granted an authorization to build a 55-MW thermal power plant located in the state of Minas Gerais (municipality of Santa Vitoria) in February 2009. The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same company as fuel. Companhia Energetica do Vale do Sao Simao signed a 35-year contract with the regulatory agency ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In , the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Of the 55 MW of electricity produced, 15 MW would be set aside for the ethanol producing unit consumption, while 25 MW was the capacity committed to the referred power purchase agreement. Companhia Energetica do Vale do Sao Simao committed to invest US$ 31.5 million (BRL 63 million) in the facility. In November 2009, the company was granted a US$ 76.93 million (BRL 153.86 million) syndicated loan contract from BNDES, a state-owned development bank. The resources from the loan was directed both to the construction of the ethanol producing unit and the cogeneration facility. Construction works on this plant were concluded in April 2010, but commercial operation commenced only in October 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data