Vale do Sao Simao Thermal Power Plant

Sector: Commercial • Location: Minas Gerais, Brazil

Source: World Bank Group

Project
Active

The Brazilian company Companhia Energetica do Vale do Sao Simao, a wholly-owned subsidiary of Grupo Andrade, was granted an authorization to build a 55-MW thermal power plant located in the state of Minas Gerais (municipality of Santa Vitoria) in February 2009. The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same company a

Status
Prospective
Sector
Commercial, Geothermal, Power Generation (CCGT), Government
Location
Minas Gerais, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vale do Sao Simao Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vale do Sao Simao Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Minas Gerais, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Companhia Energetica do Vale do Sao Simao, a wholly-owned subsidiary of Grupo Andrade, was granted an authorization to build a 55-MW thermal power plant located in the state of Minas Gerais (municipality of Santa Vitoria) in February 2009. The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same company as fuel. Companhia Energetica do Vale do Sao Simao signed a 35-year contract with the regulatory agency ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In , the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Of the 55 MW of electricity produced, 15 MW would be set aside for the ethanol producing unit consumption, while 25 MW was the capacity committed to the referred power purchase agreement. Companhia Energetica do Vale do Sao Simao committed to invest US$ 31.5 million (BRL 63 million) in the facility. In November 2009, the company was granted a US$ 76.93 million (BRL 153.86 million) syndicated loan contract from BNDES, a state-owned development bank. The resources from the loan was directed both to the construction of the ethanol producing unit and the cogeneration facility. Construction works on this plant were concluded in April 2010, but commercial operation commenced only in October 2010.

Original sector

Energy

Budget

Location

Country

Brazil

State

Minas Gerais

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Power Generation (CCGT), Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project