Vale do Tiete Toll Road
Sector: Commercial • Location: Brazil
Source: World Bank Group
Rodovia das Colinas, a joint-venture of Civilia Engenharia (90%) and Construtora Sao Luiz (10%), was awarded the contract to expand, rehabilitate and operate the Vale do Tiete highway. The bidding process was competitive and the award criteria was the highest cannon fee to be paid to the government. There is no provision for contract renewal (assets will be returned to the state government).
A
- Status
- Prospective
- Sector
- Commercial, Government, Road
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vale do Tiete Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rodovia das Colinas, a joint-venture of Civilia Engenharia (90%) and Construtora Sao Luiz (10%), was awarded the contract to expand, rehabilitate and operate the Vale do Tiete highway. The bidding process was competitive and the award criteria was the highest cannon fee to be paid to the government. There is no provision for contract renewal (assets will be returned to the state government). A total of US$ 406.1 million will be invested in infrastructure during the 20-year concession period. Commercial operation started in March 2000. The highway has 299 Km in extension. As of December 2003, Rodovia das Colinas was controlled by Empate Engenharia e Comércio Ltda (50.01%) and Herber Participações Ltda (49.99%). In 2004, the project company was granted a US$ 64.2 million (BRL 188 million) loan from BNDES and Caixa Economica to finance the construction works. http://www.rodoviasdascolinas.com.br/conheca_02.php The investments undertaken by Rodovia das Colinas , year by year were: 2001 - US$ 6.2 million (R$ 14 million ) 2002 – US$ 11.5 million (R$ 40.7 million) For the 2005-2006 period, Colinas planned on investing R$161 million. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Road |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
