logo

Validation of CST Solar Array Performance Modelling

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

Building on an existing testing and demonstration facility comprising 200 mirrors, Vast Solar constructed and deployed an additional 500 mirrors, developed a higher temperature receiver, operated the facility and gathered performance data, then determined operational requirements. Concentrating solar thermal (CST) power plants involving a solar array (field of mirrors), central receiver (known as

Project Information FAQ

Project Information

5 Q
The project “Validation of CST Solar Array Performance Modelling” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Building on an existing testing and demonstration facility comprising 200 mirrors, Vast Solar constructed and deployed an additional 500 mirrors, developed a higher temperature receiver, operated the facility and gathered performance data, then determined operational requirements. Concentrating solar thermal (CST) power plants involving a solar array (field of mirrors), central receiver (known as a power tower) and storage technologies have strong potential to reduce the cost of solar energy to levels comparable with wind-generated energy (around $100 per megawatt hour). Various design strategies are being trialled in the US, Europe and elsewhere to achieve this.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data