logo
ProjectPlanned

Valley Clean Infrastructure Plan (VCIP)

The owner, status and timeline of this project. A free account opens every field.

Source: Visalia Times-Delta

The Valley Clean Infrastructure Plan (VCIP) is an ambitious project to convert 136,000 acres of land in California's Westlands Water District into 21 gigawatts of battery-backed solar power. The project includes building solar farms, battery storage systems, and a transmission network to connect to California's grid, aiming to provide clean energy and support local agriculture amid water shortages

Status
Prospective
Sector
Power Transmission, Solar, Energy Storage, Water Supply and Storage, Raw Materials, Power Generation (CCGT), Commercial
Location
Fresno, California, United States of America
Updated
22 Jul 2026
Source
Visalia Times-Delta

ConstructChat

Ask ConstructChat about Valley Clean Infrastructure Plan (VCIP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Valley Clean Infrastructure Plan (VCIP)” is an infrastructure initiative in the Power Transmission sector, located in Fresno, California, United States. Taiyo aggregates data on it from Visalia Times-Delta.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Valley Clean Infrastructure Plan (VCIP) is an ambitious project to convert 136,000 acres of land in California's Westlands Water District into 21 gigawatts of battery-backed solar power. The project includes building solar farms, battery storage systems, and a transmission network to connect to California's grid, aiming to provide clean energy and support local agriculture amid water shortages.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

California

City

Fresno

Source

Source

Visalia Times-Delta

URL

More Details

Record type

Project

Sector

Power Transmission, Solar, Energy Storage, Water Supply and Storage, Raw Materials, Power Generation (CCGT), Commercial

Article published date

2026-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project