logo

Valley Link Transmission Line

Sector: Data Center • Location: Virginia, United States

Source: RVA Mag

Project
Planned

A 115-mile transmission line planned through Campbell to Culpeper counties by Valley Link Transmission, a $1 billion joint venture between Dominion Energy, Transource, and FirstEnergy, to address Virginia's growing energy demands.

Status
Prospective
Sector
Data Center
Location
Virginia, United States of America
Updated
22 Jul 2026
Source
RVA Mag

ConstructChat

Ask ConstructChat about Valley Link Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Valley Link Transmission Line” is an infrastructure initiative in the Data Center sector, located in Virginia, United States. Taiyo aggregates data on it from RVA Mag.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 115-mile transmission line planned through Campbell to Culpeper counties by Valley Link Transmission, a $1 billion joint venture between Dominion Energy, Transource, and FirstEnergy, to address Virginia's growing energy demands.

Original sector

Energy Infrastructure

Budget

Location

Country

United States of America (USA)

State

Virginia

Source

Source

RVA Mag

URL

More Details

Record type

Project

Sector

Data Center

Article published date

2026-04-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project