logo

Valley Road - Richardson Street Watermain Connection

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The proposed watermain connection from Valley Road to Richardson Street will provide a second connection between north and south Rockwood and reduce reliance on 40 year old thin walled watermain which is prone to breaks. This is an important connection as fire storage for Rockwood is located in the south portion. There is a single watermain connection along Highway 7 (Main Street South) in Rockwoo

Project Information FAQ

Project Information

5 Q
The project “Valley Road - Richardson Street Watermain Connection” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed watermain connection from Valley Road to Richardson Street will provide a second connection between north and south Rockwood and reduce reliance on 40 year old thin walled watermain which is prone to breaks. This is an important connection as fire storage for Rockwood is located in the south portion. There is a single watermain connection along Highway 7 (Main Street South) in Rockwood which connects north and south Rockwood and there have been recent breaks where fire protection has been lost in north Rockwood. The project would consist of approximately 260 meters of new 250 mm diameter watermain and replacement of approximately 100 meters of existing 150 mm diameter watermain with new 250 watermain. Given the layout of Rockwood, this is the best possible location to provide a much needed second connection point between north and south Rockwood. This connection was identified as a need during the infrastructure review as part of the Townships 2015 Water Rate Study. It was scheduled as a 2019 project in the Final Rate Study.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data