Valley Transit City ROW Utility Connections
Closed · Washington · Last reported Sep 2025
Source: Dodge
Work to be performed includes: water and sewer service line extensions from the City right-of-way along Avery Street to the Valley Transit main facility parcel; asphalt paving; concrete curb, gutter, and sidewalk construction; construction of a concrete driveway; and traffic control.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Car parking, Power Transmission, Automotive, Power Generation (CCGT), Government, Cement
- Location
- Richland, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Valley Transit City ROW Utility Connections
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed includes: water and sewer service line extensions from the City right-of-way along Avery Street to the Valley Transit main facility parcel; asphalt paving; concrete curb, gutter, and sidewalk construction; construction of a concrete driveway; and traffic control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Richland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Car parking, Power Transmission, Automotive, Power Generation (CCGT), Government, Cement |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
