Vallibel Denawaka Ganga SHPP
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Country Energy Pvt. Ltd., a subsidiary of Vallibel Power Erathna PLC, was planning the development of the 7.2MW Denawaka Ganga Mini Hydropower Plant, run-of-river, Denawaka Ganga at Duraikanda in the Ratnapura District. Located at Durekkanda, 9 km away from Rathnapura town in the Rathnapura Divisional secretariat in the district of Rathnapura. The project was expected to generate 25GWh annually.
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Hydro, Government
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vallibel Denawaka Ganga SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Country Energy Pvt. Ltd., a subsidiary of Vallibel Power Erathna PLC, was planning the development of the 7.2MW Denawaka Ganga Mini Hydropower Plant, run-of-river, Denawaka Ganga at Duraikanda in the Ratnapura District. Located at Durekkanda, 9 km away from Rathnapura town in the Rathnapura Divisional secretariat in the district of Rathnapura. The project was expected to generate 25GWh annually. The project was under construction in late-2011. Commissioning was expected for February 2012, and this was realized. In February 2012, it produced 341,106kWh, which increased to 1,447,874kWh in April 2012. Sri Lanka has a Standard PPA for all mini hydropower plants, Tariff is different in rain season or dry season. Hovers around $0.06/kWh. 253 crore ($1.9 million) of debt was provided by DFCC, with a tenor of 8 years. 253 crore ($1.9 million) of debt was provided by Hatton National Bank, with a tenor of 8 years. 253 crore ($1.9 million) of debt was provided by Commercial Bank of Ceylon, with a tenor of 8 years. Total debt was 759 crore ($5.7 million). Total investment was estimated at Rs.1,124 million ($8.6 million), implying an equity portion of $2.9 million (66/34). The financial closure date was unknown. Assumed here is January 2011, but more information is required. http://www.vallibel-hydro.com/projects/denawaka-hydro-power.php http://www.vallibel-hydro.com/pdf/vallibel_power_erathna_plc_ar_2011_12.pdf Financial closure date unknown - entered anyway because the project became operational on February 14th 2012. http://www.vallibel-hydro.com/investor_relations/denawaka_ganga.htm |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Hydro, Government |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project