Vallibel Kiriwaneliya Mini Hydropower Plant
Sector: Hydro • Location: Sri Lanka
Source: World Bank Group
Country Energy, a subsidiary of Vallibel Power Erathna, was planning the development of the 4.65MW Kiriwaneliya Mini Hydropower Plant, Norton Bridge in the Nuwara Eliya District: just below the Laxapana water falls in the Ginigathhena Divisional Secretariat Division of the Nuwaraeliya District. The power house site can be reached from the Norton-Bridge-Maskeliya main road. The project was expecte
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government, Commercial
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vallibel Kiriwaneliya Mini Hydropower Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Country Energy, a subsidiary of Vallibel Power Erathna, was planning the development of the 4.65MW Kiriwaneliya Mini Hydropower Plant, Norton Bridge in the Nuwara Eliya District: just below the Laxapana water falls in the Ginigathhena Divisional Secretariat Division of the Nuwaraeliya District. The power house site can be reached from the Norton-Bridge-Maskeliya main road. The project was expected to generate 16 GWh annually, to be supplied to the national grid via a 33kV transmission line. The project started construction in 2006, reportedly without the correct licensing. In 2009 Country Energy was bought by Vallibel Power Erathna for 200 million Rupees ($1.5 million). At that time, the project was reported to hold the required permits. In June 2010, the company reported to have completed construction by 75% and final commissioning was reported in December 2011. The plant eventually became operational in December 2011, when it produced 211,923kWh, growing to 654,571kWh in April 2012. Total cost was Rs815 million ($6.3 million). The equity contribution was Rs790 million for the Kiriwaneliya project as well as the Denawaka Ganga Project, reported separately. The Denawaka Ganga project was reported to cost Rs.1,124 million, bringing total project cost to Rs.1939 million, of which Rs790 million was equity financed (Debt/Equity ratio: 59.3/40.7). The financial closure date was unavailable, reported here was the company purchase date in October 2009. http://www.island.lk/2006/05/04/features4.html http://www.vallibel-hydro.com/investor_relations/kiriwaneliya.htm |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government, Commercial |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
