logo

Vallibel Kiriwaneliya Mini Hydropower Plant

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

Country Energy, a subsidiary of Vallibel Power Erathna, was planning the development of the 4.65MW Kiriwaneliya Mini Hydropower Plant, Norton Bridge in the Nuwara Eliya District: just below the Laxapana water falls in the Ginigathhena Divisional Secretariat Division of the Nuwaraeliya District. The power house site can be reached from the Norton-Bridge-Maskeliya main road. The project was expecte

Status
Prospective
Sector
Hydro, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vallibel Kiriwaneliya Mini Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vallibel Kiriwaneliya Mini Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Country Energy, a subsidiary of Vallibel Power Erathna, was planning the development of the 4.65MW Kiriwaneliya Mini Hydropower Plant, Norton Bridge in the Nuwara Eliya District: just below the Laxapana water falls in the Ginigathhena Divisional Secretariat Division of the Nuwaraeliya District. The power house site can be reached from the Norton-Bridge-Maskeliya main road. The project was expected to generate 16 GWh annually, to be supplied to the national grid via a 33kV transmission line. The project started construction in 2006, reportedly without the correct licensing. In 2009 Country Energy was bought by Vallibel Power Erathna for 200 million Rupees ($1.5 million). At that time, the project was reported to hold the required permits. In June 2010, the company reported to have completed construction by 75% and final commissioning was reported in December 2011. The plant eventually became operational in December 2011, when it produced 211,923kWh, growing to 654,571kWh in April 2012. Total cost was Rs815 million ($6.3 million). The equity contribution was Rs790 million for the Kiriwaneliya project as well as the Denawaka Ganga Project, reported separately. The Denawaka Ganga project was reported to cost Rs.1,124 million, bringing total project cost to Rs.1939 million, of which Rs790 million was equity financed (Debt/Equity ratio: 59.3/40.7). The financial closure date was unavailable, reported here was the company purchase date in October 2009. http://www.island.lk/2006/05/04/features4.html http://www.vallibel-hydro.com/investor_relations/kiriwaneliya.htm

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government, Commercial

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project