Alternate Power Systems (Pvt.) Ltd., subsidiary of Vallibel Group developed the 6.5MW run-of-river hydropower plant, Adavikanda, Kuruwita. Expected annual output was 12.63-19.93GWh. The project consisted of 3 turbines of 2.4kW each.

The project was to sell its output to the national grid (Ceylon Electricity Board). The project signed construction contracts in January 2008, including penstock cle

Project Information FAQ

Project Information

4 Q
The project “Vallibel Kuruwita SHPP” is an infrastructure initiative in the Wind sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Alternate Power Systems (Pvt.) Ltd., subsidiary of Vallibel Group developed the 6.5MW run-of-river hydropower plant, Adavikanda, Kuruwita. Expected annual output was 12.63-19.93GWh. The project consisted of 3 turbines of 2.4kW each. The project was to sell its output to the national grid (Ceylon Electricity Board). The project signed construction contracts in January 2008, including penstock clearing, transportation and painting. Commercial operation commenced in October 2009. Turbine manufacturer was Gilbert Bilkes & Gordon, from the UK. The initial feasibility study was completed in April 2005, and bank approval for financing the projectw as received in May 2005, additional financing was approved in November 2007. Equipment supply confirmation letters were completed in February 2008. The expected load factor was 35%. Expected tariff was LKR7.92 expected to increase by 5.33% annually. Land lease costs were 0.11 million annually (US$60,000). The project was tax exempt for the first 5 years. The project applied for UNFCCC CDM financing and was registered in August 2010. Financial closure date was unknown, but based on 25% of construction ESTIMATED at June 2008. Total project cost was estimated at LKR 895 million (US$6.95 million) (451 million in debt (US$3.5 million), 444 million in equity (US$3.45 million)). The interest rate on the loan was 16.82%, with a 6 year tenor. Coordinates are: N 6o 49’ 56”, E 80o 25’ 27”. http://cdm.unfccc.int/filestorage/X/6/A/X6A0MTWROG179BPQE345VZFL8KNHCI/3531%201%20MR.pdf?t=MnJ8bWV0eXp3fDCIFB70No9T6Kdt5Am-P-Rw http://cdm.unfccc.int/filestorage/6/H/M/6HMKDOAC2QVJUPY0XZ9GSE431NRI5W/APSPL%20PDD.pdf?t=V3R8bWV0eTczfDAoTbs3HoACIngRDFrkErYU

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data