Van Buren Blvd Pavement Rehabilitation Phase 3
Sector: Manufacturing (Industrial) • Location: Jurupa Valley, California, United States of America
Source: Dodge USA
The rehabilitation of AC pavement by primarily, but not limited to, grinding existing AC pavement, removal of pavement fabric as necessary, performing cold-in-place recycling, placing a rubberized hot mix asphalt overlay, replacing existing guardrail, and installing signing, striping, markings and raised pavement markers. Etiwanda Ave to Bellegrave Ave.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The rehabilitation of AC pavement by primarily, but not limited to, grinding existing AC pavement, removal of pavement fabric as necessary, performing cold-in-place recycling, placing a rubberized hot mix asphalt overlay, replacing existing guardrail, and installing signing, striping, markings and raised pavement markers. Etiwanda Ave to Bellegrave Ave. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
