logo

Van Ness Avenue At 3rd Street Regulator Station

Sector: Car parking • Location: Los Angeles, California, United States of America

Source: Los Angles Department of Water and Power (LADWP)

Project
Closed

A regulator station is a fundamental asset in LA’s water infrastructure. It reduces high water pressure to manageable levels, ensuring the safe and reliable delivery of clean tap water to the community. Built in 1955 and located in an underground vault beneath the west sidewalk on Van Ness Avenue, north of 3rd Street, this regulator station consists of 6 large valves and an approximately 100-foot

Project Information FAQ

Project Information

4 Q
The project “Van Ness Avenue At 3rd Street Regulator Station” is an infrastructure initiative in the Car parking sector, located in Los Angeles, California, United States of America. Taiyo aggregates data on it from Los Angles Department of Water and Power (LADWP).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A regulator station is a fundamental asset in LA’s water infrastructure. It reduces high water pressure to manageable levels, ensuring the safe and reliable delivery of clean tap water to the community. Built in 1955 and located in an underground vault beneath the west sidewalk on Van Ness Avenue, north of 3rd Street, this regulator station consists of 6 large valves and an approximately 100-foot network of 16- and 24-inch diameter steel pipe. Four out of the six 16-inch valves will be replaced and all of the steel pipe network around it will be replaced. This project will include a 9-foot deep excavation work area that includes the open vault, requiring a portion of the road and about 70 feet of the west sidewalk on Van Ness to be closed. Prior to the project commencing, a small section of an existing 6-inch diameter main running on Van Ness will need to be relocated to make room for installation of the new pipes. Once the project is complete, the vault ventilation pipe above ground will be replaced with low-profile vent pipe that will be less noticeable than the previous one.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data