logo

Van Wert Data Center Campus

Sector: Water Supply and Storage • Location: Van Wert, Ohio, United States

Source: Mercer County Outlook

Project
Planned

The City of Van Wert and QTS Data Centers announced plans for a data center campus in Northwest Ohio. The 902-acre campus will include up to seven data center buildings, create more than 1,500 construction jobs, and approximately 200 full-time positions once operational. The project includes energy infrastructure improvements funded by QTS at no cost to local utility bills, a closed-loop cooling s

Status
Prospective
Sector
Water Supply and Storage, Data Center, Power Transmission, Power Generation (CCGT)
Location
Van Wert, Ohio, United States of America
Updated
22 Jul 2026
Source
Mercer County Outlook

ConstructChat

Ask ConstructChat about Van Wert Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Van Wert Data Center Campus” is an infrastructure initiative in the Water Supply and Storage sector, located in Van Wert, Ohio, United States. Taiyo aggregates data on it from Mercer County Outlook.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Van Wert and QTS Data Centers announced plans for a data center campus in Northwest Ohio. The 902-acre campus will include up to seven data center buildings, create more than 1,500 construction jobs, and approximately 200 full-time positions once operational. The project includes energy infrastructure improvements funded by QTS at no cost to local utility bills, a closed-loop cooling system that consumes no water, and a community betterment fund to support local projects.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Van Wert

Source

Source

Mercer County Outlook

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Power Transmission, Power Generation (CCGT)

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project