Van Wert–Haviland 138 kV Transmission Line Project
Planned · Ohio · Last reported Sep 2025
Source: The VW independent
AEP Ohio Transmission Company, Inc. plans to rebuild and upgrade approximately 10.9 miles of existing transmission infrastructure in Paulding and Van Wert counties. The project will replace aging wooden poles with modern steel monopoles and rebuild the existing 69 kV line as a double-circuit line designed for 138 kV. The upgrade aims to improve reliability, support future economic development, and
- Status
- Prospective
- Sector
- Steel, Metal
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- The VW independent
ConstructChat
Ask ConstructChat about Van Wert–Haviland 138 kV Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AEP Ohio Transmission Company, Inc. plans to rebuild and upgrade approximately 10.9 miles of existing transmission infrastructure in Paulding and Van Wert counties. The project will replace aging wooden poles with modern steel monopoles and rebuild the existing 69 kV line as a double-circuit line designed for 138 kV. The upgrade aims to improve reliability, support future economic development, and ensure compliance with modern safety standards. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | The VW independent |
URL |
More Details
Record type | Project |
Sector | Steel, Metal |
Article published date | 2025-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
