logo

Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project

Sector: Waste Processing and Treatment • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - R

Project Information FAQ

Project Information

3 Q
The project “Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - Replacement of about 4.5 km of combined sewer in the Hastings Sunrise area with separated storm and sanitary sewers; - Installation of about 30 bio-retention bulges and about 18 catch basin with infiltration drywell manholes; - Installation of approximately 1km of sidewalks; - Restoration of disturbed surface infrastructure including manholes, service connections, other appurtenances, testing and surface restoration; - Pre & Post construction monitoring, flow monitoring; and, - Related site works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data