logo

Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - R

Status
Under Construction
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - Replacement of about 4.5 km of combined sewer in the Hastings Sunrise area with separated storm and sanitary sewers; - Installation of about 30 bio-retention bulges and about 18 catch basin with infiltration drywell manholes; - Installation of approximately 1km of sidewalks; - Restoration of disturbed surface infrastructure including manholes, service connections, other appurtenances, testing and surface restoration; - Pre & Post construction monitoring, flow monitoring; and, - Related site works.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project