Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project
Completed · British Columbia
Source: Infrastructure Canada
The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - R
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Vancouver - Hastings Sunrise Sewer Renewal & Green Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will replace the existing combined sewer with new separate sanitary and storm sewers in the Hastings Sunrise area of the City to mitigate flooding, reduce sewer overflows into local marine waters and increase capacity for future. The addition of green infrastructure components will capture pollutants and allow rain water to infiltrate the ground. The project works include: - Replacement of about 4.5 km of combined sewer in the Hastings Sunrise area with separated storm and sanitary sewers; - Installation of about 30 bio-retention bulges and about 18 catch basin with infiltration drywell manholes; - Installation of approximately 1km of sidewalks; - Restoration of disturbed surface infrastructure including manholes, service connections, other appurtenances, testing and surface restoration; - Pre & Post construction monitoring, flow monitoring; and, - Related site works. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
