logo

Vancouver - Simon Fraser University Active Transportation Connection

Sector: Education • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The proposed project includes upgrading cycling facilities to meet All Ages and Abilities (AAA) infrastructure standards as laid out in the B.C. Active Transportation Design Guide and enhancing some off-street pathway connections, including: • Boundary Road to Holdom Avenue and Kensington Avenue to Cliff Avenue: Upgrade signage, pavement markings, speed humps, intersection improvements at five lo

Status
Prospective
Sector
Education, Waste Processing and Treatment, Road, Car parking, Government, Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Vancouver - Simon Fraser University Active Transportation Connection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vancouver - Simon Fraser University Active Transportation Connection” is an infrastructure initiative in the Education sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project includes upgrading cycling facilities to meet All Ages and Abilities (AAA) infrastructure standards as laid out in the B.C. Active Transportation Design Guide and enhancing some off-street pathway connections, including: • Boundary Road to Holdom Avenue and Kensington Avenue to Cliff Avenue: Upgrade signage, pavement markings, speed humps, intersection improvements at five locations. • Kensington Park from Holdom Avenue to Fell Avenue: New 4.0m multi-use pathway on the south side of the street, including new curb and gutter, urban drainage system, and new streetlights on the south side of the street. • Fell Avenue to Hastings Street to Hammarskjold Drive to Kensington Avenue: Multi-use pathway upgrades including pathway widening and lighting along select segments. • Union Street from Kensington Avenue to Duthie Avenue: Local street bikeway upgrades. • Duthie Avenue from Union Street to Hastings Street: New protected bicycle lanes. • Hastings Street/Burnaby Mountain Parkway from Duthie Avenue to Centennial Way: Remove existing parking and construct a 4.5m multi-use pathway along the south side. • Burnaby Mountain Parkway from Centennial Way to Gaglardi Way: Reallocate existing southbound/eastbound travel lane and painted bike lane into a multi-use path on the south side.

Original sector

Active Transportation

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Education, Waste Processing and Treatment, Road, Car parking, Government, Automotive

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project