Vancouver - Simon Fraser University Active Transportation Connection
Sector: Education • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project includes upgrading cycling facilities to meet All Ages and Abilities (AAA) infrastructure standards as laid out in the B.C. Active Transportation Design Guide and enhancing some off-street pathway connections, including: Boundary Road to Holdom Avenue and Kensington Avenue to Cliff Avenue: Upgrade signage, pavement markings, speed humps, intersection improvements at five lo
- Status
- Under Construction
- Sector
- Education, Car parking, Road, Automotive
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Vancouver - Simon Fraser University Active Transportation Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project includes upgrading cycling facilities to meet All Ages and Abilities (AAA) infrastructure standards as laid out in the B.C. Active Transportation Design Guide and enhancing some off-street pathway connections, including: Boundary Road to Holdom Avenue and Kensington Avenue to Cliff Avenue: Upgrade signage, pavement markings, speed humps, intersection improvements at five locations. Kensington Park from Holdom Avenue to Fell Avenue: New 4.0m multi-use pathway on the south side of the street, including new curb and gutter, urban drainage system, and new streetlights on the south side of the street. Fell Avenue to Hastings Street to Hammarskjold Drive to Kensington Avenue: Multi-use pathway upgrades including pathway widening and lighting along select segments. Union Street from Kensington Avenue to Duthie Avenue: Local street bikeway upgrades. Duthie Avenue from Union Street to Hastings Street: New protected bicycle lanes. Hastings Street/Burnaby Mountain Parkway from Duthie Avenue to Centennial Way: Remove existing parking and construct a 4.5m multi-use pathway along the south side. Burnaby Mountain Parkway from Centennial Way to Gaglardi Way: Reallocate existing southbound/eastbound travel lane and painted bike lane into a multi-use path on the south side. |
Original sector | Active Transportation |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Education, Car parking, Road, Automotive |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Education projects in Canada
- University Of Calgary - Mackimmie Complex Civil And Landscape Redevelopment
- New Central Library & Library Plaza - LRT Encapsulation
- Menno Simons School Addition and Modernization
- Brandon University Renovations
- Eleanor W. Graham Middle School and Northrop Frye School
- University of Saskatchewan Spinks Addition
- StFX Varsity Drive Residences
- Calgary Composting Facility
