Vande Bharat Sleeper Train Project
Sector: Rail • Location: India
Source: Trade Brains
RVNL, through its SPV Kinet Railway Solutions, is executing the Rs. 14,400 crore Vande Bharat sleeper train project, which includes a 35-year maintenance contract. The first prototype train is expected to be launched by December 2026, and the project has received the Bronze A’ Design Award 2026 in Italy for excellence in mobility and transportation design.
- Status
- Under Construction
- Sector
- Rail, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Trade Brains
ConstructChat
Ask ConstructChat about Vande Bharat Sleeper Train Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | RVNL, through its SPV Kinet Railway Solutions, is executing the Rs. 14,400 crore Vande Bharat sleeper train project, which includes a 35-year maintenance contract. The first prototype train is expected to be launched by December 2026, and the project has received the Bronze A’ Design Award 2026 in Italy for excellence in mobility and transportation design. |
Original sector | Transportation |
Budget |
Location
Country | India |
Source
Source | Trade Brains |
URL |
More Details
Record type | Project |
Sector | Rail, Power Generation (CCGT) |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
