Vanessa Gas Field Commercialisation
Sector: Power Transmission • Location: South Australia, Australia
Source: TS2
Bass Oil has entered into a binding Gas Sales Agreement with Origin Energy to supply all gas produced from the Vanessa field in South Australia's Cooper Basin for up to 12.045 petajoules over three years, with first gas targeted for 2026. The project includes an existing production facility and a 5 km pipeline into the Cooper Basin transmission network, aiming for full commercialisation of the Van
- Status
- Prospective
- Sector
- Power Transmission, Oil and Gas, Power Generation (CCGT)
- Location
- South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- TS2
ConstructChat
Ask ConstructChat about Vanessa Gas Field Commercialisation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bass Oil has entered into a binding Gas Sales Agreement with Origin Energy to supply all gas produced from the Vanessa field in South Australia's Cooper Basin for up to 12.045 petajoules over three years, with first gas targeted for 2026. The project includes an existing production facility and a 5 km pipeline into the Cooper Basin transmission network, aiming for full commercialisation of the Vanessa field. |
Original sector | Energy |
Location
Country | Australia |
State | South Australia |
Source
Source | TS2 |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Oil and Gas, Power Generation (CCGT) |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
