Vanguard Renewables Anaerobic Digester Facility Auburn AD1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The proposed anaerobic digester facility will have a system controlled by an enclosed flare, a biofilter air pollution control system for the organics receiving area, a hydrolysis tank with biofilter air pollution control system, additional hydrolysis and process water tanks with air filtration systems, and a covered lagoon with air emissions controls. The natural gas produced by the system will b
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Manufacturing (Industrial), Commercial, Natural Gas
- Location
- Chagrin Falls, Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vanguard Renewables Anaerobic Digester Facility Auburn AD1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed anaerobic digester facility will have a system controlled by an enclosed flare, a biofilter air pollution control system for the organics receiving area, a hydrolysis tank with biofilter air pollution control system, additional hydrolysis and process water tanks with air filtration systems, and a covered lagoon with air emissions controls. The natural gas produced by the system will be injected into a nearby pipeline. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Chagrin Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Manufacturing (Industrial), Commercial, Natural Gas |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
