Varanasi-Ranchi-Kolkata Highway (Package 11)
Sector: Infrastructure • Location: Jharkhand, India
Source: Scanx
Construction of a 6-lane greenfield expressway from km 288.600 to km 325.500 under the Bharatmala Pariyojana in Jharkhand. The project is executed on a Hybrid Annuity Mode (HAM) basis with a total length of approximately 221.40 lane km. It includes a construction period of 730 days and an operations and maintenance period of 15 years.
- Status
- Under Construction
- Sector
- Infrastructure
- Location
- Jharkhand, India
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about Varanasi-Ranchi-Kolkata Highway (Package 11)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 6-lane greenfield expressway from km 288.600 to km 325.500 under the Bharatmala Pariyojana in Jharkhand. The project is executed on a Hybrid Annuity Mode (HAM) basis with a total length of approximately 221.40 lane km. It includes a construction period of 730 days and an operations and maintenance period of 15 years. |
Original sector | Infrastructure |
Budget |
Location
Country | India |
State | Jharkhand |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Article published date | 2026-07-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
