Variable Frequency Drive for 3 High Lifts at the Water Treatment Plant
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Install Variable Frequency Drive (VFD) at all 3 high lift pumps at Water Treatment Plant - This would free up an operator during dig jobs. The water tower runs on the booster pump, but currently the Water Treatment Plant has to be manned at all times to monitor flows, change high lift duties and flows, and ties that operator up for the duration of the problem. If the pumps had VFD’s we could elimi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Install Variable Frequency Drive (VFD) at all 3 high lift pumps at Water Treatment Plant - This would free up an operator during dig jobs. The water tower runs on the booster pump, but currently the Water Treatment Plant has to be manned at all times to monitor flows, change high lift duties and flows, and ties that operator up for the duration of the problem. If the pumps had VFD’s we could eliminate this entirely. This would also help with energy costs and maximize energy savings. Reduce energy consumption by running the high lift pumps more efficiently instead of at 100% output at all times. Improved environmental outcome: energy consumption is optimized and potentially reduce maintenance problems and extending the life of the equipment, potentially reducing the amount of waste going to the landfill. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
