NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Danube river section from Straubing to Vilshofen is a major bottleneck in the Trans-European Network regarding loaded draught and nautical difficulties. For many years, possible packages of measures have been discussed to establish homogenous shipping transport conditions and to reduce the risk of naval accidents.

While the rest of

Project Information FAQ

Project Information

5 Q
The project “Variant-independent investigation on the development of Danube waterway between Straubing and Vilshofen” is an infrastructure initiative in the Commercial sector, located in Germany. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NEED AND ADDED VALUE FOR THE DANUBE REGION STRATEGY: The Danube river section from Straubing to Vilshofen is a major bottleneck in the Trans-European Network regarding loaded draught and nautical difficulties. For many years, possible packages of measures have been discussed to establish homogenous shipping transport conditions and to reduce the risk of naval accidents. While the rest of the waterway has been adapted to a draught depth of 2.5 m almost all year round, several restrictions arise frequently due to alternating water levels in the (free flowing) section between Straubing and Vilshofen. The possible loaded draught between Straubing and Vilshofen is only 1.6 m in case of low water. On average, a draught value of 2.50 m is only available 144 days p.a. At the same time, the existing flood prevention system has to be consistently enhanced up to a 100-year flood event in due consideration of the waterway development. After many years of interdisciplinary studies and political negotiations on the possibilities for improving shipping conditions, including flood control and implementation of a regional planning procedure, there was no agreement about the variant to be used. In the course of this already finalised study, two remaining variants with different benefits and different impacts (variant A and variant C2.80) were perused as part of Priority Project 18 (Waterway axis Rhine/Meuse-Main-Danube). OBJECTIVE(S) OF THE PROJECT: The task of the study was to examine and prepare technical and ecological planning for the Danube development between Straubing and Vilshofen for both above-mentioned variants to bring about the final decision concerning the execution of the preferred variant, including the ability to carry out administrative procedures required as quickly as possible. Therefore, planning had to be executed in great detail (planning approval depth). All impacts and decision-related aspects, especially with regard to navigation, engineering, economic feasibility and environmental compatibility (regionally and globally), had to be assessed. The main objective was to provide a secure basis for informed political decision, but explicitly without giving any recommendation. CONDUCTED PROJECT ACTIVITIES: - Baseline study (e.g. survey of groundwater, surveying and mapping of fauna/flora on about 185 km², subsoil investigation, etc.). - Modelling of river morphology, groundwater regime, hydrology and hydraulics in present situation and for prospective scenarios. - Technical waterway planning respective variant A and C2.80. - Technical planning of flood protection measures. - Environmental assessment (impact, compatibility, conservation with species and landscape), compliance with EU and national directives concerning nature protection and environment conservation (e.g. Water Framework Directive, Fauna-Flora-Habitat Directive, Conservation of Wild Birds Directive). - Transport forecast and economic feasibility study. - Nautical dynamic calculations. In addition, the Federal Ministry of Transport, Building and Urban Affairs (BMVBS) had set up a project group consisting of transport, economic and environmental experts for regional surveys and monitoring purposes. TRANSBOUNDARY IMPACT: The study itself had no impact on other Danube riparian states. Nevertheless, the possible realisation of either variant would have an enormous impact on the whole Rhine/Meuse-Main-Danube axis, since the situation at the bottleneck Straubing-Vilshofen is decisive for transport decisions along the entire corridor. PROJECT BENEFICIARIES / TARGET GROUPS: The study provided the competent bodies of the Federal Republic of Germany and the Federal State of Bavaria with all necessary elements of evidence for taking their decision on the development of the Danube waterway between Straubing and Vilshofen. At the same time, planning results for both variants are now available in great detail. Final planning approval documents are based thereupon after the political decision was taken.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data