Various Active Transportation Enhancements
Sector: Seaport • Location: Ontario, Canada
Source: Infrastructure Canada
"4 bundled projects: 1. Replacing a disintegrating wood boardwalk with a new boardwalk with an edge guard to make it fully accessible and safe. The boardwalk connects the marina and Victoria Park/Beach with the west end of Cobourg’s residential area and is a very close connection to the downtown. 2. Rehabilitation of a multi-use pathway between Cottesmore Av to Brook Rd N with the addition of new
- Status
- Closed
- Sector
- Seaport, Mass Transit, Rail, Residential
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Various Active Transportation Enhancements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | "4 bundled projects: 1. Replacing a disintegrating wood boardwalk with a new boardwalk with an edge guard to make it fully accessible and safe. The boardwalk connects the marina and Victoria Park/Beach with the west end of Cobourg’s residential area and is a very close connection to the downtown. 2. Rehabilitation of a multi-use pathway between Cottesmore Av to Brook Rd N with the addition of new limestone screenings. The path is 550 metres in length and 3 metres wide. Also the path connects to another proposed project on Brook Rd N (the path connects to another proposed project on Brook Rd N). 3. This project involves the widening of paved shoulders on Brook Rd N from 250m north of King St E to the south side of CN/CPR railway to increase the connectivity for pedestrians and cyclists to the Kerr St trail. The total distance is approximately 250m. 4. Activities involve excavating and installing a multi-use path using limestone screenings as a temporary investment in AT for this section of Kerr St prior to its future build out. The path is 570m in length and 3 metres wide. This is a residential connection that will be fully accessible and safe for use by pedestrians and cyclists." |
Original sector | Active Transportation |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Seaport, Mass Transit, Rail, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
