logo

Various Active Transportation Enhancements

Sector: Mass Transit • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

"4 bundled projects: 1. Replacing a disintegrating wood boardwalk with a new boardwalk with an edge guard to make it fully accessible and safe. The boardwalk connects the marina and Victoria Park/Beach with the west end of Cobourg’s residential area and is a very close connection to the downtown. 2. Rehabilitation of a multi-use pathway between Cottesmore Av to Brook Rd N with the addition of new

Status
Under Construction
Sector
Mass Transit, Residential, Seaport, Rail, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Various Active Transportation Enhancements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Various Active Transportation Enhancements” is an infrastructure initiative in the Mass Transit sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

"4 bundled projects: 1. Replacing a disintegrating wood boardwalk with a new boardwalk with an edge guard to make it fully accessible and safe. The boardwalk connects the marina and Victoria Park/Beach with the west end of Cobourg’s residential area and is a very close connection to the downtown. 2. Rehabilitation of a multi-use pathway between Cottesmore Av to Brook Rd N with the addition of new limestone screenings. The path is 550 metres in length and 3 metres wide. Also the path connects to another proposed project on Brook Rd N (the path connects to another proposed project on Brook Rd N). 3. This project involves the widening of paved shoulders on Brook Rd N from 250m north of King St E to the south side of CN/CPR railway to increase the connectivity for pedestrians and cyclists to the Kerr St trail. The total distance is approximately 250m. 4. Activities involve excavating and installing a multi-use path using limestone screenings as a temporary investment in AT for this section of Kerr St prior to its future build out. The path is 570m in length and 3 metres wide. This is a residential connection that will be fully accessible and safe for use by pedestrians and cyclists."

Original sector

Active Transportation

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Mass Transit, Residential, Seaport, Rail, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project