Various HMA Streets Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project consists of PCC pavement, HMA pavement, variable depth surface removal, concrete gutter removal and rplacement in various locations, and related appurtenances 1. 327 sq yd HMA SURG REM BUTT JT 2. 293 sq yd PCC SURF REM BUTT JT 3. 279 sq yd TEMPORARY RAMP 4. 1016 ton HMA BC IL-9.5FG N70 5. 1874 ton HMA SC IL-9.5 C N70 6. 10680 pounds BIT MATLS TACK CT 7. 1454 foot GUTTER REM 8. 39 sq ft SID
- Status
- Closed
- Sector
- Cement, Road, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- O Fallon, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Various HMA Streets Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of PCC pavement, HMA pavement, variable depth surface removal, concrete gutter removal and rplacement in various locations, and related appurtenances 1. 327 sq yd HMA SURG REM BUTT JT 2. 293 sq yd PCC SURF REM BUTT JT 3. 279 sq yd TEMPORARY RAMP 4. 1016 ton HMA BC IL-9.5FG N70 5. 1874 ton HMA SC IL-9.5 C N70 6. 10680 pounds BIT MATLS TACK CT 7. 1454 foot GUTTER REM 8. 39 sq ft SIDEWALK REM 9. 97 sq yd CL C PATCH T4 6 10. 270 foot PIPE CULVERT REM 11. 209 foot STORM SEW CL A 1... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | O Fallon |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
