Various Locations Pavement Renovation No. 59 and Sewer Replacement
Sector: Car parking • Location: San Francisco, California, United States of America
Source: SF Public Works
San Francisco Public Works has contracted with Michael O’Shaughnessy Construction Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 59 (VL59). We will be performing thishis work in the Central Bayview, Twin Peaks, Eureka Valley and Duboce Park neighborhoods., We h
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | San Francisco Public Works has contracted with Michael O’Shaughnessy Construction Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 59 (VL59). We will be performing thishis work in the Central Bayview, Twin Peaks, Eureka Valley and Duboce Park neighborhoods., We have inspected the sewer facilities of all the blocks listed below, and will be replacing those that we found to be cracked and/or broken. Replacing these pipes now will prevent possible collapse of the sewer mains and pavement in the future. Sewer service will not be interrupted during the construction. Pavement Renovation and Sewer replacement work will occur between September 2023 and September 2024., This project will include sewer main replacement, curb ramp installation, street base repairs and repaving. Work hours will vary by location, however, typical working hours are 7 a.m. to 5 p.m. Monday through Friday. Weekend work is allowed but has not been scheduled at this time., Street resurfacing work will be taking place on the following blocks. Only those in bold will be receiving sewer work as well:, Phelps Street from Newcomb to La Salle, Phelps Street from La Salle to Fairfax, McKinnon Avenue from Phelps to 3rd, Oakdale Avenue from Phelps to Newhall, Oakdale Avenue from Newhall to 3rd, Quint Street from Oakdale to Newcomb, Underwood Avenue from Jennings to Ingalls, Shafter Avenue from Industrial to end, Burnett Avenue from Twin Peaks to Hopkins, Burnett Avenue from Danview to Crestline, Graystone Terrace from Iron Alley to Corbett, Corbett Avenue from Clayton to Mars, Douglass Street from 21st to 22nd, 19th Street from Yukon to Douglass - Starting Monday, December 4th, 19th Street from Collingwood to Castro, Collingwood Street from 18th to 19th, 15th Street from Market to Church, States Street from Levant to Castro, Levant Street from States to Lower Terrace, Ord Street from Ord Court to Saturn Street Stairway, Ord Street from Saturn Street Stairway to 17th - Starting the week of 11/27/23, Ord Street from 17th to Corbett, , Construction Updates, 11/27/23: On Monday, December 4th, we will begin constructing new, ADA-compliant curb ramps at the intersection of States Street and Levant Street. We will also be constructing curb ramps mid-block on States Street between Levant Street and Castro Street. We expect work at these two locations to take roughly one week to complete. Street and sidewalk access will be maintained at all times throughoug this project, but some street parking restrictions will be in place during construction. A few weeks after this work is complete, we will be re-paving the entire block of States Street from Levant Street to Castro Street., 11/17/23: On Monday, November 27th, we will begin sewer main replacement work on Ord Street between 17th Street and the Saturn Street Stairway. Once we install the sewer main on this block, we will then replace any damaged sewer laterals, which are the smaller pipes that run perpendicular to the curb and connect the sewer main with household plumbing systems. We expect this work to take about 2 to 3 weeks to complete, barring any unforeseen circumstances.After work on this block is complete, we will then re-pave the entire block. Note: this work will not interrupt plumbing service, and you can continue to use your household plumbing normally throughout this project. During construction, all on-street parking and through traffic will be prohibited on this block. Local access to residents of Ord Street will remain throughout the project., On Monday, November 27th, we will begin curb ramp construction work at the intersection of Sharon Street and 15th Street. The scope of work for this project includes the construction of two new curb ramps across Sharon Street as well as the reconstruction of nearby portions of the sidewalk and curb lane. We expect this work to tke about two weeks to complete barring any unforeseen circumstances, equipment issues, or weather issues. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
