San Francisco Public Works has contracted with Michael O’Shaughnessy Construction Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 59 (VL59). We will be performing thishis work in the Central Bayview, Twin Peaks, Eureka Valley and Duboce Park neighborhoods., We h

Project Information FAQ

Project Information

5 Q
The project “Various Locations Pavement Renovation No. 59 and Sewer Replacement” is an infrastructure initiative in the Car parking sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SF Public Works.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

San Francisco Public Works has contracted with Michael O’Shaughnessy Construction Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 59 (VL59). We will be performing thishis work in the Central Bayview, Twin Peaks, Eureka Valley and Duboce Park neighborhoods., We have inspected the sewer facilities of all the blocks listed below, and will be replacing those that we found to be cracked and/or broken.  Replacing these pipes now will prevent possible collapse of the sewer mains and pavement in the future. Sewer service will not be interrupted during the construction.  Pavement Renovation and Sewer replacement work will occur between September 2023 and September 2024., This project will include sewer main replacement, curb ramp installation, street base repairs and repaving. Work hours will vary by location, however, typical working hours are 7 a.m. to 5 p.m. Monday through Friday. Weekend work is allowed but has not been scheduled at this time., Street resurfacing work will be taking place on the following blocks. Only those in bold will be receiving sewer work as well:, Phelps Street from Newcomb to La Salle, Phelps Street from La Salle to Fairfax, McKinnon Avenue from Phelps to 3rd, Oakdale Avenue from Phelps to Newhall, Oakdale Avenue from Newhall to 3rd, Quint Street from Oakdale to Newcomb, Underwood Avenue from Jennings to Ingalls, Shafter Avenue from Industrial to end, Burnett Avenue from Twin Peaks to Hopkins, Burnett Avenue from Danview to Crestline, Graystone Terrace from Iron Alley to Corbett, Corbett Avenue from Clayton to Mars, Douglass Street from 21st to 22nd, 19th Street from Yukon to Douglass - Starting Monday, December 4th, 19th Street from Collingwood to Castro, Collingwood Street from 18th to 19th, 15th Street from Market to Church, States Street from Levant to Castro, Levant Street from States to Lower Terrace, Ord Street from Ord Court to Saturn Street Stairway, Ord Street from Saturn Street Stairway to 17th - Starting the week of 11/27/23, Ord Street from 17th to Corbett, , Construction Updates, 11/27/23: On Monday, December 4th, we will begin constructing new, ADA-compliant curb ramps at the intersection of States Street and Levant Street. We will also be constructing curb ramps mid-block on States Street between Levant Street and Castro Street. We expect work at these two locations to take roughly one week to complete. Street and sidewalk access will be maintained at all times throughoug this project, but some street parking restrictions will be in place during construction. A few weeks after this work is complete, we will be re-paving the entire block of States Street from Levant Street to Castro Street., 11/17/23: On Monday, November 27th, we will begin sewer main replacement work on Ord Street between 17th Street and the Saturn Street Stairway. Once we install the sewer main on this block, we will then replace any damaged sewer laterals, which are the smaller pipes that run perpendicular to the curb and connect the sewer main with household plumbing systems. We expect this work to take about 2 to 3 weeks to complete, barring any unforeseen circumstances.After work on this block is complete, we will then re-pave the entire block. Note: this work will not interrupt plumbing service, and you can continue to use your household plumbing normally throughout this project. During construction, all on-street parking and through traffic will be prohibited on this block. Local access to residents of Ord Street will remain throughout the project., On Monday, November 27th, we will begin curb ramp construction work at the intersection of Sharon Street and 15th Street. The scope of work for this project includes the construction of two new curb ramps across Sharon Street as well as the reconstruction of nearby portions of the sidewalk and curb lane. We expect this work to tke about two weeks to complete barring any unforeseen circumstances, equipment issues, or weather issues.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data