Various Locations Water Main Replacement & Loop Closure
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This Project Will Install 720-feet Of 8-inch Diameter Water Main To Replace Existing 4-inch & 6-inch Diameter Water Main On Bellevue Road From W. Sylvania Avenue To Eastbrook Drive. This Project Will Resurface Bellevue From W. Sylvania Avenue To Westbook Drive. This Project Will Install 77-feet Of 8-inch Diameter Water Main By Horizontal Directional Drilling Across Eleanor Avenue To Close The Loop
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government
- Location
- Toledo, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Various Locations Water Main Replacement & Loop Closure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project Will Install 720-feet Of 8-inch Diameter Water Main To Replace Existing 4-inch & 6-inch Diameter Water Main On Bellevue Road From W. Sylvania Avenue To Eastbrook Drive. This Project Will Resurface Bellevue From W. Sylvania Avenue To Westbook Drive. This Project Will Install 77-feet Of 8-inch Diameter Water Main By Horizontal Directional Drilling Across Eleanor Avenue To Close The Loop On A Dead End Main. This Project Will Resurface Lyman Road From Royalton Road To Eleanor Avenue.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Toledo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
