Various Schools Paving Replacement & Site Improvements
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: Dodge
Project Involves Full Depth Pavement Removal (12 Min Depth) Within The Areas Defined At Each School, Along With Additional Subbase Soil Removal Within Certain Areas That Have Been Delineated. Installation Of a New Full Depth Pavement Section (2/4/6) And Subbase Replacement And Compaction Where Indicated, Along With Pavement Markings And Striping, Signage, Utility Structure And Casting Resetting, A
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Government, Power Generation (CCGT), Automotive
- Location
- Englishtown, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Various Schools Paving Replacement & Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Involves Full Depth Pavement Removal (12 Min Depth) Within The Areas Defined At Each School, Along With Additional Subbase Soil Removal Within Certain Areas That Have Been Delineated. Installation Of a New Full Depth Pavement Section (2/4/6) And Subbase Replacement And Compaction Where Indicated, Along With Pavement Markings And Striping, Signage, Utility Structure And Casting Resetting, And Limited Curb And Sidewalk Removal And Replacement. Pine Brook School Will Only Receive a Pavem... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Englishtown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Government, Power Generation (CCGT), Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
