Various Sewer Improvements - Moncton
Sector: Waste Processing and Treatment • Location: New Brunswick, Canada
Source: Infrastructure Canada
As part of a study and subsequent flood mitigation strategy developed in 2018, these sewer improvements on Caledonia, Somers, and Raymond Street are critical to address flooding related to climate change and increased rainfalls. This area is prone to street and property flooding due to its low elevation in relation to the nearby floodplain surrounding Ogilvie Brook. The infrastructure being replac
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Various Sewer Improvements - Moncton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | As part of a study and subsequent flood mitigation strategy developed in 2018, these sewer improvements on Caledonia, Somers, and Raymond Street are critical to address flooding related to climate change and increased rainfalls. This area is prone to street and property flooding due to its low elevation in relation to the nearby floodplain surrounding Ogilvie Brook. The infrastructure being replaced includes the road infrastructure, water system and sanitary sewer system in addition to the installation of storm sewer relief system. A storm sewer relief system includes the installation of storm sewer pipes, catch basins and a storm sewer outfall. The purpose of this system is to reduce the risk of flooding in the area. The streets being reconstructed as part of this project include Caledonia Road between the Trans-Canada ramp and McNaughton Avenue (600m in length), Somers Drive from Caledonia Road to the end (200m in length) and Raymond Street from Caledonia Road to the end (175m in length). |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
