logo
ProjectProject In Operation

Vasil Levski Sofia Airport Expansion

Project in operation · Sofiya

Source: InfraPPPWorld

The project involves the design and construction of a new Terminal 3 building (approximately 60,000–65,000 m²), along with a new curbside, a transportation center (transport hub of about 9,000 m² with bus stands and improved connectivity), and the comprehensive modernization and refurbishment of the existing Terminal 2 at Vasil Levski Sofia Airport located 5km east of the center of Sofia, the capi

Status
Under Construction
Sector
Airport, Mass Transit, Commercial, Road
Location
Sofiya, Bulgaria
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Vasil Levski Sofia Airport Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vasil Levski Sofia Airport Expansion” is an infrastructure initiative in the Airport sector, located in Sofiya, Bulgaria. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

project in operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the design and construction of a new Terminal 3 building (approximately 60,000–65,000 m²), along with a new curbside, a transportation center (transport hub of about 9,000 m² with bus stands and improved connectivity), and the comprehensive modernization and refurbishment of the existing Terminal 2 at Vasil Levski Sofia Airport located 5km east of the center of Sofia, the capital of Bulgaria.This major expansion, led by the airport’s concessionaire SOF Connect, aims to create a unified, efficient airport system with a combined capacity to serve up to 15–20 million passengers annually. It includes new boarding gates (contributing to a total of 34), enhanced passenger facilities, better integration between terminals, upgraded infrastructure, and improved road access and public transport links. Construction of Terminal 3 is scheduled to start in autumn 2026 and is targeted for completion around April 2031 as part of a broader multi-year modernization program to position Sofia Airport as a leading five-star regional hub in Europe. The 35-year concession concerns the operation and management of all buildings, facilities, and visual air navigation systems within the airport territory, which spans a little over 5km2. It also involves the construction of a third terminal, which must be completed by the tenth year of the concession.

Original sector

Transport

Budget

Location

Country

Bulgaria

State

Sofiya

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Airport, Mass Transit, Commercial, Road

Article published date

2026-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project