logo

Vasil Levski Sofia Airport Expansion

Sector: Airport • Location: Sofiya, Bulgaria

Source: InfraPPPWorld

Project
Project In Operation

The project involves the design and construction of a new Terminal 3 building (approximately 60,000–65,000 m²), along with a new curbside, a transportation center (transport hub of about 9,000 m² with bus stands and improved connectivity), and the comprehensive modernization and refurbishment of the existing Terminal 2 at Vasil Levski Sofia Airport located 5km east of the center of Sofia, the capi

Project Information FAQ

Project Information

4 Q
The project “Vasil Levski Sofia Airport Expansion” is an infrastructure initiative in the Airport sector, located in Sofiya, Bulgaria. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in operation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the design and construction of a new Terminal 3 building (approximately 60,000–65,000 m²), along with a new curbside, a transportation center (transport hub of about 9,000 m² with bus stands and improved connectivity), and the comprehensive modernization and refurbishment of the existing Terminal 2 at Vasil Levski Sofia Airport located 5km east of the center of Sofia, the capital of Bulgaria.This major expansion, led by the airport’s concessionaire SOF Connect, aims to create a unified, efficient airport system with a combined capacity to serve up to 15–20 million passengers annually. It includes new boarding gates (contributing to a total of 34), enhanced passenger facilities, better integration between terminals, upgraded infrastructure, and improved road access and public transport links. Construction of Terminal 3 is scheduled to start in autumn 2026 and is targeted for completion around April 2031 as part of a broader multi-year modernization program to position Sofia Airport as a leading five-star regional hub in Europe. The 35-year concession concerns the operation and management of all buildings, facilities, and visual air navigation systems within the airport territory, which spans a little over 5km2. It also involves the construction of a third terminal, which must be completed by the tenth year of the concession.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data