Vasilikos LNG Terminal
Sector: LNG • Location: Cyprus
Source: Philenews
Cyprus's first liquefied natural gas (LNG) infrastructure at Vasilikos is on track for completion by end-2025, with the floating storage and regasification unit (FSRU) expected to be operational at the terminal. Natural gas imports are scheduled to begin in the first quarter of 2026 for testing by both the Electricity Authority of Cyprus and private power producers.
- Status
- Under Construction
- Sector
- LNG, Power Generation (CCGT), Natural Gas
- Location
- Cyprus
- Updated
- 22 Jul 2026
- Source
- Philenews
ConstructChat
Ask ConstructChat about Vasilikos LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cyprus's first liquefied natural gas (LNG) infrastructure at Vasilikos is on track for completion by end-2025, with the floating storage and regasification unit (FSRU) expected to be operational at the terminal. Natural gas imports are scheduled to begin in the first quarter of 2026 for testing by both the Electricity Authority of Cyprus and private power producers. |
Original sector | Energy |
Location
Country | Cyprus |
Source
Source | Philenews |
URL |
More Details
Record type | Project |
Sector | LNG, Power Generation (CCGT), Natural Gas |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
