logo

Vasilikos LNG Terminal

Sector: LNG • Location: Cyprus

Source: Philenews

Project
Under Construction

Cyprus's first liquefied natural gas (LNG) infrastructure at Vasilikos is on track for completion by end-2025, with the floating storage and regasification unit (FSRU) expected to be operational at the terminal. Natural gas imports are scheduled to begin in the first quarter of 2026 for testing by both the Electricity Authority of Cyprus and private power producers.

Status
Under Construction
Sector
LNG, Power Generation (CCGT), Natural Gas
Location
Cyprus
Updated
22 Jul 2026
Source
Philenews

ConstructChat

Ask ConstructChat about Vasilikos LNG Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Vasilikos LNG Terminal” is an infrastructure initiative in the LNG sector, located in Cyprus. Taiyo aggregates data on it from Philenews.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Cyprus's first liquefied natural gas (LNG) infrastructure at Vasilikos is on track for completion by end-2025, with the floating storage and regasification unit (FSRU) expected to be operational at the terminal. Natural gas imports are scheduled to begin in the first quarter of 2026 for testing by both the Electricity Authority of Cyprus and private power producers.

Original sector

Energy

Location

Country

Cyprus

Source

Source

Philenews

URL

More Details

Record type

Project

Sector

LNG, Power Generation (CCGT), Natural Gas

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project