Vatia S.A. ESP
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
Vatia S.A – E.S.P (“Vatia” or the “Company”) was established in 1998 and is currently the largest non-incumbent electricity retailer / aggregator in Colombia. Currently, Vatia supplies between 70 and 75 GWh per month (900 GWh per year) to approximately 30.000 customers. Its operations are handled by Hidrotolima with five small hydropower plants (SHPPs) in the Tolima department and Vatia with eigh
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Solar, Hydro, Government
- Location
- Colombia
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Vatia S.A. ESP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Vatia S.A – E.S.P (“Vatia” or the “Company”) was established in 1998 and is currently the largest non-incumbent electricity retailer / aggregator in Colombia. Currently, Vatia supplies between 70 and 75 GWh per month (900 GWh per year) to approximately 30.000 customers. Its operations are handled by Hidrotolima with five small hydropower plants (SHPPs) in the Tolima department and Vatia with eight SHPPs in the Cauca department, as follows:Hidrotolima SHPPs include (a) Mirolindo which produced 19 GW in 2019 and is located 1 km distant from the closest community, Ibague, the capital of the state; (b) Rio Recio which produced 1 GW in 2019 and is located 0.5 km distant from La Sierra its closest community; (c) Ventana which produced 23 GW in 2019 and is located 3 km distant from Chicoral its closest community; (d) Pastales which produced 4 GW in 2019 and is located 0.3 km distant from Pastales-Pico de Oro, its closest community; and (e) Santiago which produced 10 GW in 2019 and is located 0.2 km distant from Santiago, its closest community. Neither is near to either biodiversity preserved or cultural patrimony sites. Vatia SHPPs include (a) Florida II which produced 92 GW in 2019 and is located 10 km distant from Popayan its closest community; (b) Sajandi which produced 14 GW in 2019 and is located 20 km distant from El Bordo its closest community; (c) Rio Palo which produced 8 GW in 2019 and is located 7 km distant from Caloto its closest community; (d) Ovejas which produced 1 GW in 2019 and is located 8 km distant from Suarez its closest community; (e) Inza which produced 4 GW in 2019 and is located 8 km distant from Inza its closest community; (f) Mondomo, which produced 4 GW in 2019 and is located 6 km distant from Santander de Quilichao its closest community; (g) Asnazu which produced 3 GW in 2019 and is located 4 km distant from Suarez its closest community; and (h) Silvia which produced 2 GW in 2019 and is located 2 km distant from Silvia its closest community. Neither is near to either biodiversity preserved or cultural patrimony sites. The proposed project includes a US$10m million investment as preferred equity in Vatia to (a) acquire 37MW of solar assets (b) refinance existing debt and (c) provide equity to increase its trading and commercialization activities (the “Project”) |
Original sector | V-IA - Electric Power Other (Including Holding Companies) |
Location
Country | Colombia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Solar, Hydro, Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
