Vattenfall SMR Nuclear Project at Ringhals
Sector: Nuclear • Location: Sweden
Source: POWER Magazine
Swedish utility Vattenfall has narrowed its small modular reactor (SMR) supplier selection to two finalists—GE Vernova Hitachi Nuclear Energy’s BWRX-300 and the Rolls-Royce SMR—for potential construction of new nuclear capacity adjacent to its Ringhals plant site on Sweden’s Värö Peninsula. The project aims to build either five BWRX-300 SMRs or three Rolls-Royce SMRs, providing a total output of 1
- Status
- Prospective
- Sector
- Nuclear, Automotive, Power Generation (CCGT), Power Transmission, Commercial
- Location
- Sweden
- Updated
- 22 Jul 2026
- Source
- POWER Magazine
ConstructChat
Ask ConstructChat about Vattenfall SMR Nuclear Project at Ringhals
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Swedish utility Vattenfall has narrowed its small modular reactor (SMR) supplier selection to two finalists—GE Vernova Hitachi Nuclear Energy’s BWRX-300 and the Rolls-Royce SMR—for potential construction of new nuclear capacity adjacent to its Ringhals plant site on Sweden’s Värö Peninsula. The project aims to build either five BWRX-300 SMRs or three Rolls-Royce SMRs, providing a total output of 1,500 MWe. The project is necessary to meet rising electricity demand, bolster energy security, and advance Sweden's net-zero targets. Vattenfall's board decided on July 18, 2025, to build the new project following an extensive evaluation process. The utility is also considering building another 1 GW in a next step near Ringhals 1 and 2. Final investment decisions will be made later in the process. |
Original sector | Energy |
Location
Country | Sweden |
Source
Source | POWER Magazine |
URL |
More Details
Record type | Project |
Sector | Nuclear, Automotive, Power Generation (CCGT), Power Transmission, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
