Vaughan Creek Bridge (V300) Replacement
One of 10,000+ projects Taiyo tracks in New Brunswick.
Source: Dodge USA
NBDTI is conducting a Design-Build request for a fixed price proposal with milestone payments for the design, procurement and construction of a new, two lane, wooden covered bridge including revision of the approaches, the removal and disposal of the existing covered bridge and the removal of the return of the temporary modular bridge at Vaughan Creek
- Status
- Closed
- Sector
- Commercial, Bridge, Road, Government
- Location
- Fredericton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vaughan Creek Bridge (V300) Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Notice of Completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NBDTI is conducting a Design-Build request for a fixed price proposal with milestone payments for the design, procurement and construction of a new, two lane, wooden covered bridge including revision of the approaches, the removal and disposal of the existing covered bridge and the removal of the return of the temporary modular bridge at Vaughan Creek |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Fredericton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road, Government |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
