Vazante I Wind Farm
Sector: Solar • Location: Brazil
Source: World Bank Group
The project entails the construction of Vazante I Wind Farm, part of Pirapora Phase III Wind Complex in Minas Gerais, Brazil. SPV is Vazante I Energias Renováveis S.A, a subsidiary of Omega Energia Renovavel (50 %) and EDF Energies Nouvelles SA (50 %). The sponsors covers $ 24.06 million of the total cost while the rest is provided as bond financing issued by BNDES ($ 23.55 million). The project w
- Status
- Prospective
- Sector
- Solar, Cable car, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vazante I Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of Vazante I Wind Farm, part of Pirapora Phase III Wind Complex in Minas Gerais, Brazil. SPV is Vazante I Energias Renováveis S.A, a subsidiary of Omega Energia Renovavel (50 %) and EDF Energies Nouvelles SA (50 %). The sponsors covers $ 24.06 million of the total cost while the rest is provided as bond financing issued by BNDES ($ 23.55 million). The project was awarded a 20 years PPA back in 2014 with Agencia Nacional de Energia Eletrica, a Brazilian government entity. Financial close took place on November 26, 2018. http://www.aneel.gov.br/documents/655816/15001369/ESCALADA+SET+2016/7c222f99-c558-4e14-b383-08249952087e https://ijglobal.com/articles/136711/pirapora-pv-complex-reaches-fc-in-brazil https://www.edf-renouvelables.com/en/project/pirapora-1-3/ http://www2.aneel.gov.br/aplicacoes/Empreendimento/ResumoUsina.asp?lbxUsina=32339:Vazante%201 |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Cable car, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
