Veeraballi Pumped Storage Project
One of 10,000+ projects Taiyo tracks in India.
Source: Power Peak Digest
Environmental Clearance for the 1800 MW Veeraballi pumped storage project was deferred due to concerns over land increase, forest diversion, and pending approvals. The project requires revisions and additional clarifications before proceeding.
- Status
- Failure
- Sector
- Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about Veeraballi Pumped Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Environmental Clearance for the 1800 MW Veeraballi pumped storage project was deferred due to concerns over land increase, forest diversion, and pending approvals. The project requires revisions and additional clarifications before proceeding. |
Original sector | Power |
Location
Country | India |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
