Vehicle Acquisition (Phase 10)
Sector: Energy Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
Procurement of approximately 15 Heavy Duty Battery Electric Buses. Heavy Duty BEBs will be 40-foot low-floor accessible buses with a minimum seated capacity of 40 passengers, with minimum 675 kWh batteries for an operating range of 375km or better. Buses will be equipped with plug-in ports for depot charging, heat pump for onboard HVAC, and supplemented with Diesel auxiliary heating. BEBs will hav
- Status
- Prospective
- Sector
- Energy Storage, Automotive, Seaport
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Vehicle Acquisition (Phase 10)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Procurement of approximately 15 Heavy Duty Battery Electric Buses. Heavy Duty BEBs will be 40-foot low-floor accessible buses with a minimum seated capacity of 40 passengers, with minimum 675 kWh batteries for an operating range of 375km or better. Buses will be equipped with plug-in ports for depot charging, heat pump for onboard HVAC, and supplemented with Diesel auxiliary heating. BEBs will have an expected service life of 13 years. BEBs will be equipped with all passenger and operator safety features currently in service with the BC Transit fleet, including interior and exterior CCTV; and with passenger convenience features including NextRide visual/audio stop notification. These buses will support expansion growth, reducing the reliance on diesel-fueled vehicles and supporting CleanBC targets for reducing greenhouse gas (GHG) emissions. |
Original sector | Public Transit |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Automotive, Seaport |
Article published date | 2026-04-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
