Vehicle Acquisition (Phase 13)
Sector: Energy Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
Acquisition of approximately six Light Duty (LD) battery-electric buses (BEBs) to pilot the provision of custom (handyDART) transit services using zero-emissions vehicles. Buses will replace vehicles currently at end of service life. Addition of these battery-electric vehicles to the fleet will provide an opportunity to reduce greenhouse gas (GHG) emissions aligning with BC Transit’s strategic pla
- Status
- Prospective
- Sector
- Energy Storage, Electric Vehicles (EVs), Automotive
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Vehicle Acquisition (Phase 13)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Acquisition of approximately six Light Duty (LD) battery-electric buses (BEBs) to pilot the provision of custom (handyDART) transit services using zero-emissions vehicles. Buses will replace vehicles currently at end of service life. Addition of these battery-electric vehicles to the fleet will provide an opportunity to reduce greenhouse gas (GHG) emissions aligning with BC Transit’s strategic plan to electrify its fleet by 2040. The project scope also aligns with The Province’s CleanBC emissions reduction goals. |
Original sector | Public Transit |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Electric Vehicles (EVs), Automotive |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
