Veir STAR Data Center Transmission Pilot
Completed · Massachusetts · Last reported Nov 2025
Source: Data Center Dynamics
Veir completed its first data center transmission demonstration project using its Superconducting Technology for AI Racks (STAR) system. The project demonstrated that a single low-voltage cable can transmit 3MW of power in a simulated data center environment, proving the commercial readiness of the technology for scalable, high-power data center applications.
- Status
- Closed
- Sector
- Commercial, Data Center, Power Generation (CCGT)
- Location
- Woburn, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Data Center Dynamics
ConstructChat
Ask ConstructChat about Veir STAR Data Center Transmission Pilot
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Veir completed its first data center transmission demonstration project using its Superconducting Technology for AI Racks (STAR) system. The project demonstrated that a single low-voltage cable can transmit 3MW of power in a simulated data center environment, proving the commercial readiness of the technology for scalable, high-power data center applications. |
Original sector | Energy & Sustainability |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Woburn |
Source
Source | Data Center Dynamics |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Power Generation (CCGT) |
Article published date | 2025-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
