Velda Dairy Road, Ox Bottom Road Intersection Realignment
Sector: Water Supply and Storage • Location: Tallahassee, Florida, United States of America
Source: Dodge
This project generally consists of the construction of roadways, drainage system, and traffic signals and mast arms installation at the modified intersection of Velda Dairy Road and Thomasville Road, as well as the associated turn-lane improvements for Thomasville Road and Velda Dairy Road. The project also includes inlets, crosswalks, sidewalks, signages, pavement markings, and pedestrian signali
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Consumer Products, Raw Materials, Car parking, Commercial, Waste Processing and Treatment, Road, Automotive
- Location
- Tallahassee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Velda Dairy Road, Ox Bottom Road Intersection Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project generally consists of the construction of roadways, drainage system, and traffic signals and mast arms installation at the modified intersection of Velda Dairy Road and Thomasville Road, as well as the associated turn-lane improvements for Thomasville Road and Velda Dairy Road. The project also includes inlets, crosswalks, sidewalks, signages, pavement markings, and pedestrian signalization improvements. The project also includes other items incidental to the infrastructure repla... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tallahassee |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Consumer Products, Raw Materials, Car parking, Commercial, Waste Processing and Treatment, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
