Venard Road Force Main Replacement
Sector: Water Supply and Storage • Location: Downers Grove, Illinois, United States of America
Source: Dodge USA
The proposed construction consists of installation of approximately 975 lineal feet of dual-pipe, 10-inch sanitary force main, and other miscellaneous items of work. Total length of proposed 10-inch sanitary force main pipe is approximately 1,950 lineal feet.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Downers Grove, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Venard Road Force Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed construction consists of installation of approximately 975 lineal feet of dual-pipe, 10-inch sanitary force main, and other miscellaneous items of work. Total length of proposed 10-inch sanitary force main pipe is approximately 1,950 lineal feet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Downers Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
