Vengalem-Kuttipuram NH17 Road
Sector: Road • Location: India
Source: World Bank Group
On 20th July 2009, National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 910 days) to KMC Constructions Limited, for the strengthening, improvement,4-laning,operation and maintenance, and tolling of 83.2kms of Vengalem-Kuttipuram section from KM148.000 to KM230.000 of National Highway 17, in the state of Kerala.
Under the contract, KMC was re
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | On 20th July 2009, National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 910 days) to KMC Constructions Limited, for the strengthening, improvement,4-laning,operation and maintenance, and tolling of 83.2kms of Vengalem-Kuttipuram section from KM148.000 to KM230.000 of National Highway 17, in the state of Kerala. Under the contract, KMC was responsible for the design,construction,finance, operation and maintenance,strengthening and widening the existing 2-lane carriageway to 4-lane divided carriageway.The scope included construction of new pavement,rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges,culverts, road intersections,interchanges, drains, etc.The expansion project, part of the National Highway Development Program (NHDP-IIIB), was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. KMC won the tender through international competitive bidding, conducted by NHAI, by quoting the lowest subsidy (a negative grant) - the SPV would pay NHAI a sum of US$ 118.3mn (INR 5409.9mn @45.72 INR/USD).Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling, during the term of concession. The concession agreement was signed on 24th February 2010. The project did not close financing at the time of cancellation. The estimated capital cost of the project at the time of bidding was US$ 298.8mn (INR 13660mn @45.72INR/USD). The project was expected to start construction by May 2010. However, even after a lapse of three-and-a-half years, the requisite land/right of way (ROW) could not be made available by NHAI. For the Vengalam-Kuttipuram section, only 62 per cent of land was available,which included the 45m width available for the 28-km long Calicut bypass. Finally NHAI canceled the concession in September 2013. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |